26.09.2014
This involves identifying the parts of the plant that are constraining production and removing the constraint. It might involve increasing the size of some of the pipework, increase the power of the compressors and/or increasing the capacity of the gas treatment units. The modifications will vary from plant to plant and will be specific to that plant. The work is typically carried out during a maintenance shutdown and can often realize an additional 10% of LNG production